Bartow Executive Airport (Digital Tower Operations Center)
Photo of the airport: US Geological Survey, Public domain, via Wikimedia Commons.
Bartow Executive Airport (Digital Tower Operations Center) is a remote tower: cameras and sensors at the airport feed controllers who work somewhere else. Installed at Bartow; active control testing was slated for January 2026 and full air traffic control services were targeted for July 2026.
About this site
Bartow Executive Airport (Digital Tower Operations Center) (KBOW / BOW) is in United States. Air traffic service here is provided by FDOT / airport; the equipment named in public sources comes from Frequentis.
The first dated event in our records is 2025: Frequentis installation (project March 2023 to November 2025). The latest is Jul 2026: Full services targeted.
We label it trial because it is being tested or run in shadow mode, without approved live service, with high confidence because an operator, regulator or the airport itself states it. This page draws on 3 public sources, listed below.
The nearest other site we track is Winter Haven Regional Airport (United States), about 14 km away. United States has 6 sites in our records, 0 of them operational.
Looking ahead: in our hypothetical future-state view for United States, 1,682 airports there with no tower meet a simple remote service rule. That is a what-if from public data, not a plan.
What the sources say
- Installed at Bartow; active control testing was slated for January 2026 and full air traffic control services were targeted for July 2026.https://airportimprovement.com/article/bartow-executive-redefines-air-traffic-control-with-digital-tower-and-onsite-controller-training/
- Frequentis reports its X10 voice system went live there; the CANSO story is dated 12 March 2026.https://canso.org/?p=117565
- The FAA's Digital Tower Systems page (renamed from Remote Tower Systems, last updated 4 September 2026) says the FAA is evaluating designs at the Technical Center and will update it when (and if) it issues a System Design Approval.https://www.faa.gov/airports/planning_capacity/non_federal/digital_tower_systems
Timeline
- 2025Frequentis installation (project March 2023 to November 2025)
- Jan 2026Active control testing planned
- Jul 2026Full services targeted
Connections
Lines join each airport to the centre that controls it. Basemap: OpenStreetMap data via Protomaps.
Open in the connections view ยท Timeline for this site
Other sites in United States
At a glance
- ICAO
- KBOW
- Country
- United States
- Type
- Remote tower
- Vendor
- Frequentis
- Provider
- FDOT / airport
- Status
- Trial
- Program
- faa-rts
- Position
- 27.943, -81.783