Plannedconfidence high
skeyes digital tower control centre, Namur
skeyes digital tower control centre, Namur is a remote tower centre: the facility where controllers work for one or more airports. skeyes says the Namur building was completed in 2025, will be further equipped in 2026 and become operational in 2027; Liège and Charleroi will be controlled from it.
Caveat. Plotted at Namur; exact site approximate.
What the sources say
- skeyes says the Namur building was completed in 2025, will be further equipped in 2026 and become operational in 2027; Liège and Charleroi will be controlled from it.https://annualreport.skeyes.be/en/innovation/digital-towers
Timeline
- 2025Building completed annualreport.skeyes.be
- 2027Planned to become operational (equipped in 2026) annualreport.skeyes.be
Connections
Lines join each airport to the centre that controls it. Basemap: OpenStreetMap data via Protomaps.
Open in the connections view · Timeline for this site
Other sites in Belgium
At a glance
- ICAO
- n/a
- Country
- Belgium
- Type
- Remote tower centre
- Vendor
- Saab
- Provider
- skeyes
- Status
- Planned
- Program
- skeyes-namur
- Position
- 50.467, 4.872