319 airports assessed. 44 have no tower and meet a tier 1 to 3 rule (0 / 2 / 42). 76 towered airports fit tiers 1 to 3. A hypothetical set of 5 centres covers them. 1 public traffic source loaded.

Hypothetical. Illustrative. Not a recommendation of any authority. Every number here comes from a stated rule applied to public data. It describes a what-if, not a plan, forecast or advice to any country, airport or authority.
319airports assessed
44no tower, tier 1 to 3
76towered, tier 1 to 3
0isolated, tier 4
5hypothetical centres
17.8 millionpeople near a gap airport

Orange, teal, pink and grey dots are suggested tiers. Hollow rings are towered airports that fit a tier. White-ringed orange dots are hypothetical centres. Green outlined dots are remote or digital towers already listed on this site. Basemap: OpenStreetMap data via Protomaps.

What it could enable

  • Service where there is none. 44 airports have no tower but meet a traffic or infrastructure rule. Remote service could give them separation or advisory service they cannot justify as a conventional tower. About 1.5 million people live within 50 km of one of them and of no towered airport.
  • Fewer, shared positions. 76 towered airports fit tiers 1 to 3. Serving some of them from 5 shared centres could change how towers are staffed, equipped and replaced when they age.
  • Different working pattern. A centre of about 24 airports lets part-time airports share a controller across the day, and lets busy periods at different airports fall on different positions.
  • Already moving. 2 airports here are listed on this site as remote or digital (operational, trial or planned). See them.

The gap in numbers

TierNo tower todayTowered today
Tier 1: Full remote tower service053
Tier 2: Part-time remote tower223
Tier 3: Remote advisory (AFIS-like)420
Tier 4: Surface awareness only0n/a
Large hub, left alonen/a9
Traffic on gap airports
0 passengers (0 airports with a figure)
Population
68.6 million (World Bank 2024)
People in cities of 15,000+
33.1 million
Within 50 km of a gap airport
17.8 million
... and of no towered airport
1.5 million
Near only an isolated airfield
0
Airports with air-ground service already
29 of the gap airports have an AFIS-type frequency listed
Data quality. 0 of the 44 airports without a tower that meet a rule have a traffic figure; the rest are placed by runway, size class and scheduled-service flag only. Covers commercial passenger traffic. Movements and general aviation are not in this table.

Candidate airports

AirportTierClassPassengersMovementsCentre
Castres Mazamet Airport
LFCK · Castres
Tier 2No tower, scheduled passenger servicen/an/a
Aurillac airport
LFLW · Aurillac
Tier 2No tower, scheduled passenger servicen/an/a
Plan-de-Dieu-Orange Airfield
LFPR · Travaillan, Vaucluse
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Péronne Saint-Quentin Airfield
LFAG · Monchy-Lagache, Somme
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Valenciennes-Denain Airfield
LFAV · Prouvy
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Amiens Glisy Airfield
LFAY · Amiens
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Montluçon-Guéret Airport
LFBK · Lépaud, Creuse
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Niort - Marais Poitevin Airport
LFBN · Niort/Souché
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Angoulême Brie-Champniers airport
LFBU · Angoulême
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Périgueux-Bassillac Airport
LFBX · Périgueux/Bassillac
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Aérodrome d'Arcachon-La Teste-de-Buch
LFCH · Arcachon/La Teste-de-Buch
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Albi Le Sequestre airport
LFCI · Albi
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Ouessant Airport
LFEC · Ushant
Tier 3No tower, scheduled passenger servicen/an/a
Le Puy-Loudes Airfield
LFHP · Chaspuzac, Haute-Loire
Tier 3No tower, scheduled passenger servicen/an/a
Chaumont-Semoutiers Airfield
LFJA · Villiers-le-Sec, Haute-Marne
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a

Hypothetical centres

Centre siteAirportsTier 1 / 2 / 3Farthest
DSNA Remote Tower Centre Toulouse
Existing remote tower centre (planned)
3013 / 9 / 8315 km
DSNA Remote Tower Centre Toulouse
Existing remote tower centre (planned)
3512 / 6 / 17493 km
Rouen Vallée de Seine Airport
Existing staffed tower facility
3114 / 7 / 10259 km
Châteaudun Airfield
Existing staffed tower facility
2010 / 3 / 7479 km
Ajaccio Napoléon Bonaparte airport
Existing staffed tower facility
44 / 0 / 090 km

Responsible implementation

A tier on this page is a starting question. These are the topics any real plan would need to answer. Public guidance:

Safety case and regulator approval

Each service needs its own safety case and approval before it carries traffic. A design approval for equipment is a different step from permission to run a service. This site's records name no regulator for France yet; the national supervisory authority would decide.

Controller workforce and training

Remote work changes the job: new displays, new failure modes, and new competence checks. A plan would cover who moves, who trains, how existing controllers choose, and what happens to current staff and their conditions.

Communications and surveillance

Radio, video and surveillance links must meet the latency and quality the safety case assumes. Tier 1 and 2 airports need reliable cameras, redundant links and a surveillance picture for traffic that radar or ADS-B cannot see from the ground.

Contingency and redundancy

Every centre needs a fallback: a second path for data, a backup position, and a rule for what the airport does when a link fails (hold, divert, revert to advisory). Centres that serve many airports need a plan for losing all of them at once.

Cybersecurity

A centre is a single high-value target. It needs the same protections as other air traffic systems: segmented networks, supply-chain checks, logging, and tested recovery.

Community and labour engagement

Airports, airlines, pilots, unions, local governments and neighbours should be in the process before decisions, not after. Jobs can move away from small airports, and that is a real cost to a community.

Sources