157 airports assessed. 31 have no tower and meet a tier 1 to 3 rule (0 / 3 / 28). 48 towered airports fit tiers 1 to 3. A hypothetical set of 4 centres covers them. 1 public traffic source loaded.

Hypothetical. Illustrative. Not a recommendation of any authority. Every number here comes from a stated rule applied to public data. It describes a what-if, not a plan, forecast or advice to any country, airport or authority.
157airports assessed
31no tower, tier 1 to 3
48towered, tier 1 to 3
0isolated, tier 4
4hypothetical centres
32.9 millionpeople near a gap airport

Orange, teal, pink and grey dots are suggested tiers. Hollow rings are towered airports that fit a tier. White-ringed orange dots are hypothetical centres. Green outlined dots are remote or digital towers already listed on this site. Basemap: OpenStreetMap data via Protomaps.

What it could enable

  • Service where there is none. 31 airports have no tower but meet a traffic or infrastructure rule. Remote service could give them separation or advisory service they cannot justify as a conventional tower. About 525 thousand people live within 50 km of one of them and of no towered airport.
  • Fewer, shared positions. 48 towered airports fit tiers 1 to 3. Serving some of them from 4 shared centres could change how towers are staffed, equipped and replaced when they age.
  • Different working pattern. A centre of about 19.8 airports lets part-time airports share a controller across the day, and lets busy periods at different airports fall on different positions.
  • Already moving. 7 airports here are listed on this site as remote or digital (operational, trial or planned). See them.

The gap in numbers

TierNo tower todayTowered today
Tier 1: Full remote tower service029
Tier 2: Part-time remote tower318
Tier 3: Remote advisory (AFIS-like)281
Tier 4: Surface awareness only0n/a
Large hub, left alonen/a10
Traffic on gap airports
61 thousand passengers (5 airports with a figure), 8 thousand movements (5 airports)
Population
69.3 million (World Bank 2024)
People in cities of 15,000+
57.8 million
Within 50 km of a gap airport
32.9 million
... and of no towered airport
525 thousand
Near only an isolated airfield
0
Airports with air-ground service already
6 of the gap airports have an AFIS-type frequency listed
Data quality. 5 of the 31 airports without a tower that meet a rule have a traffic figure; the rest are placed by runway, size class and scheduled-service flag only. Reporting airports only (about 50). Other airports have no published movements here.

Candidate airports

AirportTierClassPassengersMovementsCentre
Islay Airport
EGPI · Isle of Islay, Argyll and Bute
Tier 2No tower, scheduled passenger service30,5352,198
Barra Airport
EGPR · Eoligarry
Tier 2No tower, scheduled passenger service11,0571,264
Eday Airport
EGED · Eday
Tier 2No tower, scheduled passenger servicen/an/a
Tiree Airport
EGPU · Balemartine, Argyll and Bute
Tier 3No tower, scheduled passenger service9,8291,666
Campbeltown Airport
EGEC · Campbeltown
Tier 3No tower, scheduled passenger service7,0071,246
Lerwick / Tingwall Airport
EGET · Lerwick, Shetland Islands
Tier 3No tower, scheduled passenger service2,8401,190
Bruntingthorpe Aerodrome
EG74 · Lutterworth, Leicestershire
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Sywell Aerodrome
EGBK · Northampton, Northamptonshire
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Cotswold Airport
EGBP · Cirencester, Gloucestershire
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Turweston Aerodrome
EGBT · Turweston
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Royal Marines Base Chivenor
EGDC · Chivenor
Tier 3No tower, infrastructure proxy (no traffic figure)n/an/a
Fair Isle Airport
EGEF · Fair Isle
Tier 3No tower, scheduled passenger servicen/an/a
Coll Airport
EGEL · Coll Island
Tier 3No tower, scheduled passenger servicen/an/a
North Ronaldsay Airport
EGEN · North Ronaldsay
Tier 3No tower, scheduled passenger servicen/an/a
Oban Airport
EGEO · North Connel
Tier 3No tower, scheduled passenger servicen/an/a

Hypothetical centres

Centre siteAirportsTier 1 / 2 / 3Farthest
NATS Swanwick Digital Tower Centre
Existing remote tower centre (operational)
3214 / 6 / 12213 km
Blackpool Airport
Existing staffed tower facility
3014 / 8 / 8424 km
Kirkwall Airport
Existing staffed tower facility
151 / 5 / 9343 km
NATS Swanwick Digital Tower Centre
Existing remote tower centre (operational)
20 / 2 / 0373 km

Responsible implementation

A tier on this page is a starting question. These are the topics any real plan would need to answer. Public guidance:

Safety case and regulator approval

Each service needs its own safety case and approval before it carries traffic. A design approval for equipment is a different step from permission to run a service. This site's records name no regulator for United Kingdom yet; the national supervisory authority would decide.

Controller workforce and training

Remote work changes the job: new displays, new failure modes, and new competence checks. A plan would cover who moves, who trains, how existing controllers choose, and what happens to current staff and their conditions.

Communications and surveillance

Radio, video and surveillance links must meet the latency and quality the safety case assumes. Tier 1 and 2 airports need reliable cameras, redundant links and a surveillance picture for traffic that radar or ADS-B cannot see from the ground.

Contingency and redundancy

Every centre needs a fallback: a second path for data, a backup position, and a rule for what the airport does when a link fails (hold, divert, revert to advisory). Centres that serve many airports need a plan for losing all of them at once.

Cybersecurity

A centre is a single high-value target. It needs the same protections as other air traffic systems: segmented networks, supply-chain checks, logging, and tested recovery.

Community and labour engagement

Airports, airlines, pilots, unions, local governments and neighbours should be in the process before decisions, not after. Jobs can move away from small airports, and that is a real cost to a community.

Sources

Towers already listed for United Kingdom: remote and digital sites in United Kingdom.