Groningen Airport Eelde
Photo of the airport: Kas van Zonneveld, CC BY-SA 4.0, via Wikimedia Commons.
Groningen Airport Eelde is a remote tower: cameras and sensors at the airport feed controllers who work somewhere else. LVNL chose Saab Digital Air Traffic Solutions for Groningen and Maastricht Aachen; service was planned from the end of 2021.
About this site
Groningen Airport Eelde (EHGG / GRQ) is in Netherlands. Air traffic service here is provided by LVNL; the equipment named in public sources comes from Saab.
The controllers for this airport do not sit at the airport. Sources link it to LVNL Remote Tower Centre (Schiphol Oost), about 150 km away in a straight line, which is also linked to 1 other airport in our records.
The first dated event in our records is Dec 2019: SDATS contract. The latest is Dec 2024: Airport project page marks the project complete.
We label it planned because it has been announced, ordered or funded but is not running yet, with low confidence because the evidence is old, secondary or from a single source. This page draws on 4 public sources, listed below.
The nearest other site we track is Emden Airport (Germany), about 53 km away. Netherlands has 3 sites in our records, 0 of them operational.
Looking ahead: in our hypothetical future-state view for Netherlands, 1 airports there with no tower meet a simple remote service rule. That is a what-if from public data, not a plan.
What the sources say
- LVNL chose Saab Digital Air Traffic Solutions for Groningen and Maastricht Aachen; service was planned from the end of 2021.https://www.internationalairportreview.com/news/108966/sdats-contract-build-remote-towers
- The airport's project page lists May 2018 to December 2024 and says air traffic control is run remotely from the Remote Tower Centre at Schiphol Oost.https://www.groningenairport.nl/en/sustainability/project-portfolio/remote-tower
- LVNL's 2025 annual report says the Centralised Base programme (Groningen and Maastricht Aachen) has been postponed since 2022 because of capacity and permit delays; further rollout follows full introduction of the iTEC-based centre automation system.https://jaarverslag.lvnl.nl/jaarverslag-2025/veiligheid/projectportfolio-overige-projecten
- The airport's own project page says 'This project is complete and will not be updated further' and that air traffic is controlled from the Remote Tower Centre at Schiphol Oost.https://www.groningenairport.nl/en/sustainability-innovation/project-portfolio/remote-tower
Timeline
- Dec 2019SDATS contract
- Dec 2024Airport project page marks the project complete
Connections
Lines join each airport to the centre that controls it. Basemap: OpenStreetMap data via Protomaps.
Open in the connections view ยท Timeline for this site
Other sites in Netherlands
At a glance
- ICAO
- EHGG
- Country
- Netherlands
- Type
- Remote tower
- Vendor
- Saab
- Provider
- LVNL
- Status
- Planned
- Program
- lvnl-centralised
- Position
- 53.119, 6.578
Sources
4 public sources: jaarverslag.lvnl.nl, groningenairport.nl, groningenairport.nl, internationalairportreview.com.