How towers connect

Who supplies, who runs, who regulates and which airports are controlled from which centre, drawn from the same sourced records as the map. Pick two kinds of party to see how many sites join them, then tap a name or a line to list the sites. Approvals and go-lives timeline.

with

Tap a name or a line above to list the sites it covers.

Remote tower centres and the airports they control

Each centre is controlled by one provider; every airport chip opens that airport.

Planned1 airport

ŘLP planned remote tower centre, Mošnov (Ostrava)

Czech Republic · ŘLP ČR · vendor not named

Planned1 airport

DSNA Remote Tower Centre Toulouse

France · DSNA · Frequentis

Operational2 airports

DFS Aviation Services Remote Tower Center Niedersachsen

Germany · DFS Aviation Services · Frequentis

Cancelled0 airports

Inverness (HIAL Combined Surveillance Centre)

United Kingdom · HIAL · vendor not named

No airports linked in sources.
Operational1 airport

NATS Swanwick Digital Tower Centre

United Kingdom · NATS · Saab

By vendor

  • Saab 33 sites
    Works with: LFV (10), skeyes (4), IAA (Irish Aviation Authority) (3), LVNL (3), NATS (2), Royal Navy (2), ROMATSA (2), Airservices Australia (2)
  • Kongsberg 25 sites
    Works with: Avinor (23), Aena and ENAIRE (1), NAV CANADA (1)
  • Indra 25 sites
    Works with: Avinor (15), Fintraffic ANS (8), HungaroControl (1), SANS (1)
  • Frequentis 22 sites
    Works with: DFS and DFS Aviation Services (8), DSNA (2), FDOT / airport (2), Airservices Australia (2), Airways New Zealand (2), n/a (2), US Army (1), Naviair (1)
  • Searidge Technologies 10 sites
    Works with: NATS (3), Aena and ENAIRE (1), FAA (1), Airport Authority Hong Kong / CAD (1), CAAS (1), Airservices Australia (1), Qatar Civil Aviation Authority (1), DSNA (1)
  • Adacel 5 sites
    Works with: EANS (5)
  • FerroNATS 1 sites
    Works with: Aena and ENAIRE (1)
  • OKI 1 sites
    Works with: Japan Civil Aviation Bureau (1)

By provider

Programs

Regulators named in sources

  • CASA 2 sites
    Western Sydney International Airport, Airservices Digital Aerodrome Service centre, Eastern Creek
  • CAAC 2 sites
    Chizhou Jiuhuashan Airport (remote tower trial), Xinyuan Nalati Airport (remote tower trial)
  • Norwegian CAA 1 sites
    Bodø Remote Towers Centre
  • AESA (Spain) 1 sites
    Vigo Airport
  • Transport Canada 1 sites
    Kingston Airport (Ontario)
  • JCAB 1 sites
    Amami Airport (remote aerodrome air-ground service)
  • Qatar CAA 1 sites
    Hamad International Airport (hybrid virtual tower)

Latest approvals

  • 2 Oct 2026
    Colorado Aeronautical Board hears that guidance was issued and design approval granted; award timing is described as uncertain. citizenportal.ai
  • 28 Sep 2026
    FAA Office of Airports issues PGL 26-06 on AIP funding of Digital Airport Traffic Control Tower systems. It does not grant operational approval. faa.gov
  • 18 Sep 2026
    FY27 Contract Tower Competitive Grant Program opens; digital towers are eligible if FAA-certified. Applications close 19 October 2026. faa.gov
  • 4 Sep 2026
    FAA Digital Tower Systems page last updated. It says the FAA is renaming Remote Tower to Digital Tower, is evaluating designs at the Technical Center and will update the page when (and if) it issues a System Design Approval. At our 11 Oct 2026 review it did not list the 2 Sep approval that PGL 26-06 describes. faa.gov
  • 2 Sep 2026
    FAA grants system design approval to Frequentis USA, with conditions (as stated in AIP Program Guidance Letter 26-06). faa.gov
  • 27 Aug 2025
    AIN: FAA tests systems at the Technical Center and selected RTX-Frequentis for design approval evaluation; no approvals issued yet. backend.ainonline.com
  • 6 Feb 2025
    FAA page states remote tower systems are not currently approved for use in the NAS and lists no system design approval. faa.gov
  • 16 May 2024
    FAA Reauthorization Act of 2024 signed. Reason summarizes Section 621: a defined design and operational approval process within 180 days, briefings through September 2028, and eligibility under the Contract Tower Program. reason.org
  • Oct 2014
    Operational approval Örnsköldsvik Airport

All approvals

An approval on this site is only what a source says was approved, by whom and when. A design approval is not an operational authorization.